The Bay Area Air District has fined Gold Bond Building Products for 13 violations related to dust at its wallboard manufacturing plant at 1040 Canal Boulevard.

Along with the $188,500 fine, the Air District is also requiring Gold Bond to take additional physical and operational steps to reduce dust emissions and better protect nearby communities.

The wallboard manufacturing plant handles large volumes of gypsum rock and fine mineral powder, relying on enclosures, filtration equipment, and strict operating procedures to keep the powder from releasing into the air.

“Dust from the Gold Bond plant has drifted well past its property line, into the neighborhoods and businesses nearby,” said Dr. Philip Fine, executive officer of the Air District. “Neighbors should not bear the pollution of the business next door, and this penalty requires Gold Bond to upgrade the equipment and practices that keep its dust contained. We will continue to hold the facility accountable to ensure clean air for the Richmond community."

The plant sits a short distance from a proposed 76-home development on a former quarry site at 1135 Canal Boulevard. The Quarry Residential Project would build single-family homes on 6.3 acres of the 18.4-acre site, south of Canal Boulevard and Seacliff Drive.

Quarry Residential Project to be discussed at special meeting Wednesday
A 76-unit residential development planned for a former quarry site in Point Richmond will be discussed at a special Design Review Board meeting on Wednesday, December 17. The Quarry Residential Project is proposed for 1135 Canal Boulevard, an 18.4-acre site sits south of the intersection of Canal

As part of the requirements, Gold Bond will upgrade its equipment and practices to keep dust contained and implement physical and operational improvements at the plant to reduce impacts on neighboring communities.

Improvement plans include: building a permanent enclosure around the plant’s outdoor gypsum pile by December 31, 2027, an upgrade to the dust collection equipment that captures airborne material inside the plant, strengthening inspection, monitoring, maintenance, and corrective action practices, including ongoing employee training on air quality and dust control, and improving controls where gypsum is loaded, handled, and processed to reduce airborne dust.

Gold Bond will also be required to expand its monitoring and recordkeeping so that the Air District can confirm the plant stays in compliance over time.

The Air District will allocate penalty funds collected through this enforcement action in accordance with its Community Benefits Policy to support local and regional projects that improve air quality and public health.

YOU GET MORE WITH A PAID SUBSCRIPTION

Your subscription enables Grandview Independent to deliver more:

  • More time devoted to in-depth reporting
  • Longer, more comprehensive stories
  • Greater coverage of what matters to our community

Quality journalism costs money. Subscriptions allow us to keep reporting the stories that matter, without paywalls getting in the way of critical community information.

CLICK HERE TO SUBSCRIBE - Starting at just $10/month

FOLLOW US FOR BREAKING NEWS:
• Twitter: @GrandviewIndy
• Instagram: @GrandviewIndependent
• Facebook: @Grandview Independent

Share this article
The link has been copied!